Description du système d'alimentation électrique et de l'instrument de contrôle électronique du congélateur à ultra-basse température
Ultra-low temperature freezer needs to be tested after a long time of use. What should be paid attention to when the power supply and electronic control instrument system are inspected?
Check the ultra-low temperature freezer power supply and the electronic control instrument system. Before starting the power, check whether the power distribution capacity matches the unit power, and whether the selected cable diameter can withstand the host operating current. Check whether the electrical system is consistent with the unit. The unit is electrically: three-phase five-wire system (three phase lines, one neutral line, one ground line, 380V ± 10%). Check if the power supply line of the compressor is connected tightly. If it is loose, retighten it. The torque at the compressor wiring is 500kg/cm. Due to factors such as long-distance transportation and lifting, the screws may be loose. Failure to do so may result in damage to electrical components (such as air switches, AC contactors, etc.) and compressors in the main control cabinet.
Use a multimeter to carefully check all the electrical circuits of the ultra-low temperature freezer, check that the wiring is properly installed in place; use megaohm measurement to make sure there is no short circuit in the case; check that the ground wire is properly installed in place, and the insulation resistance to ground is greater than 2MΩ; check if the power cable is suitable. Capacity requirements. Check if the disconnect switch is installed on the power supply line of the supply unit. All the wiring of the main circuit in the control cabinet and the external wiring of the control circuit can be energized after comprehensive inspection (such as crankcase oil heater, compressor electronic protector, circulating water temperature sensor, target flow switch wiring, pump connection) Control, etc.); Check if the terminal bolts are tightened and there is no looseness.
The performance of the power supply and the electronic control instrument are more important in the operation of the ultra-low temperature cold box, so regular inspection is recommended.
Recommandations connexes
-
Small environmental test chamber compressor should pay attention after maintenance
1117In the centrifugal small-scale environmental test chamber, the suction recovery device is generally an independent system, and if necessary, the pipeline connected to the condenser and the evaporator can be closed for separate maintenance. After r...
Voir les détails -
Measures for stable operation of short-range molecular distiller
904If the short-range molecular distiller is inefficient during operation, it will affect the use of the associated refrigeration heating temperature control system. How does the short-range molecular distiller maintain stable operation? If the steam...
Voir les détails -
With these points, the use efficiency of the ultra-low temperature chiller can be more efficient
1070The structure of the ultra-low temperature chiller is more complicated. Its main function is to provide cold air to the product, which is the refrigeration function. If you want to improve the efficiency of the freezer, you must pay attention to t...
Voir les détails -
The reason why the semiconductor small thermostat is blocked by refrigeration
1224The small semiconductor small-scale thermostat ice jam is mainly caused by the excessive moisture contained in the refrigeration system. With the continuous circulation of the refrigerant, the moisture in the refrigeration system gradually collect...
Voir les détails