Sélection et entretien d'un refroidisseur à ultra-basse température
Today, a customer came to inquire about our need for a small laboratory water chiller. The specific working condition is to reduce the materials in the 20L stainless steel reactor from normal temperature to minus 30 ℃ in more than one hour. This product is too simple for us. The LT-50 series chiller can easily meet all the operating conditions. For model selection, please remember the basic formula: tank volume (or material weight) * material specific heat * temperature difference/second.
Then, maintenance plays a key role in the stable operation of the equipment. After shutdown, start to use the refrigerant recovery device to recover refrigeration.
After the refrigerant is recovered, open the end cover of the water chamber, clean the circulating water system, and replace the oil filter element; After maintenance and installation, vacuum the system with a vacuum pump and maintain the pressure for 24 hours to ensure good airtightness. In the process of filling refrigerant, it is found that the refrigerant cannot be inhaled. It is confirmed that the system is leaking water, and then find the leak point. First, close the inlet and outlet valves at the water side of the evaporator and condenser. After the water inside the machine is drained, open the covers at both ends of the water side of the evaporator and condenser and fully close the outlet valve of the compressor to form a closed space. Refill refrigerant and mark the leakage point. Then, the evaporator and condenser are dried to remove the residual air in the system. Repeat this for many times to ensure that all the air in the system is discharged. Open the bottom corner valve to drain the residual liquid water in the system. Repeat flushing until no residual liquid water is discharged; Finally, the compressor shall be treated by removing the motor first and then drying it, and the withstand voltage test shall be carried out by professionals; Then conduct overall inspection and maintenance, replace damaged parts, and then assemble the compressor as a whole.
The above is about the selection and maintenance of ultra-low temperature chiller. Later, we will talk about the matters needing attention during installation and use.
Recommandations connexes
-
Industrial grade heating and cooling system placement attention
1281Industrial-grade heating and cooling system Before the power is turned on, check whether the voltage specified on the nameplate is the same as the household voltage. The same can be used to arrange separate power lines and special sockets for the ...
Voir les détails -
What is the principle of industrial air-cooled chillers
1600Many industrial productions are inseparablefrom the low-temperature production environment provided by the chiller andcannot obtain efficient production capacity. Therefore, industrial chillerequipment is a very important refrigeration equipmen...
Voir les détails -
Comment résoudre le problème du régulateur de pression du réfrigérateur à très basse température ?
1285If the industrial ultra-low temperature refrigerator encounters a controller-related failure during operation, if it is not resolved in time, the pressure controller may be unavailable. The pressure controller plays a very important role in the ul...
Voir les détails -
Comment choisir un fabricant avec un faible taux d'échec 3p freezer?
979Le choix d'un congélateur 3p dépend de nombreux facteurs et les utilisateurs doivent faire preuve de prudence lorsqu'ils choisissent un fabricant. Choisissez un congélateur 3p avec un faible taux de défaillance pour réduire les coûts d'exploitation. Lors de l'utilisation d'un congélateur 3p, le coût d'utilisation d'un congélateur 3p contiendra...
Voir les détails